by KGalbraith | Dec 5, 2020
The Rivera Middle School master plan is to become a 1,500 student K-8 school to meet the changing needs of the local community. The joint-use gymnasium is the first of three phases of the expansion and was partially funded with the District’s local Measure S Bond and...
by KGalbraith | Dec 5, 2020
The Merced City School District created their first K-8 school to reorganize the District grade levels at all other schools. The entire District reorganization depended on this school being completed by August 2015. In order to expedite the design and construction,...
by KGalbraith | Dec 5, 2020
With the conversion of the school from a traditional grade 6-8 school, the administration and library needed to be more central to the overall campus. The design team converted an existing 5 classroom building to a new elementary and middle school administration on...
by KGalbraith | Dec 5, 2020
The College added a much-needed Student Resources Building located in a prime area that required some road rerouting and major utility relocation before the building’s footprint could be started. This project is a Construction Type V-B, it was reviewed by the Division...
by KGalbraith | Dec 5, 2020
In November 2012, voters approved the Sonora Union High School District’s $23 Million bond issuance for the Sonora High School Measure J Improvements. WLC Architects (along with California Professional Management) was hired under the “single-source” integrated project...