by KGalbraith | Dec 5, 2020
With the conversion of the school from a traditional grade 6-8 school, the administration and library needed to be more central to the overall campus. The design team converted an existing 5 classroom building to a new elementary and middle school administration on...
by KGalbraith | Dec 5, 2020
The College added a much-needed Student Resources Building located in a prime area that required some road rerouting and major utility relocation before the building’s footprint could be started. This project is a Construction Type V-B, it was reviewed by the Division...
by KGalbraith | Dec 5, 2020
In November 2012, voters approved the Sonora Union High School District’s $23 Million bond issuance for the Sonora High School Measure J Improvements. WLC Architects (along with California Professional Management) was hired under the “single-source” integrated project...
by KGalbraith | Dec 5, 2020
The Victor Elementary School District’s most current elementary school, Galileo Academy, is a “repeat” project based on a prototype indoor school that was developed for the Menifee Union School District. This 53,412 square foot campus is designed to accommodate up to...
by KGalbraith | Dec 5, 2020
The Dr. Ralph H. Baker 21st Century Learning Center project is designed to provide a “21st century learning environment” to the children of the Victor Elementary School District. This 67,500 square foot campus shall accommodate up to 750 students in an adaptive, open...