West Valley Mosquito & Vector Control District – Phase ll

Project Overview

The WVMVCD TI – Phase II project was initially envisioned by the Owner to be a “simple” office expansion within the second floor their existing warehouse facility. The Owner worked with their Architect to develop the scope of work to include: 1) 7,500 s.f. of new conference area, training room, four laboratory units, restrooms and large open office plan and; 2) approximate 2,500 s.f. of existing facility renovation: conversion of conference area to three offices, new ornamental staircase, elevator core, and reconfiguration of the entry lobby. As the project was under construction, the Owner determined to renovate the entire existing HVAC system (replacing all existing ductwork, equipment, and conversion to new EMS system) via change order. In addition, while under construction, deficiencies in the original building construction were discovered causing further delay and required remediation. The project, originally scheduled as a 4 month construction duration, required 6.5 months to complete.

Key Metrics

Estimated Cost:

$1.492 Million

Construction Cost:

$1,459,000

Completion:

November 2014

Senior Project Manager:

N/A

Project Manager:

Daryl Van Dran

Superintendent:

Matt Wade

Square Footage:

10,000

Project Duration: 

6.5 Months

Principal:

Jonathan Clarke

Delivery Method

CM / Multi-Prime

Related Projects

CIVIC

West Valley Mosquito & Vector Control District – Phase ll

West Valley Mosquito & Vector Control District – Phase ll

The WVMVCD TI – Phase II project was initially envisioned by the Owner to be a “simple” office expansion within the second floor their existing warehouse facility. The Owner worked with their Architect to develop the scope of work to include: 1)

Ontario, CA

Turlock Public Safety Facility

Turlock Public Safety Facility

The Turlock Public Safety Facility was constructed on 4.5 acres in the downtown redevelopment area of Turlock, California. The new 59,550 square foot facility will house the Fire Department Administration, all Police Services, the 911 Center, ...

Turlock, CA

Delano Police Department

Delano Police Department

On this unique project, the 32,364 square foot facility is designed to house all of the necessary departments including: Police Administration (Records/Evidence/Dispatch), Patrol Operations, Investigations, and general support areas. Special ...

Delano, CA

Want to Learn More About This Project?

We’d be happy to share additional information about this project, answer questions, and talk about the nuances of managing construction projects for your industry.